United States › Grid › Interconnection queues › Tennessee

HYDRO · SOUTHEAST

Hydro project 648, Grainger County

Hydro project 648, Grainger County is a 32.0 MW hydro request in interconnection study in the Southeast interconnection queue, in Grainger County, Tennessee, connecting to Tennessee Valley Authority.

Queue statusIn planning
  1. PlanningQueued Sep 2024 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Feb 2028 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
648
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Tennessee Valley Authority
Connection point (POI)
Cherokee HP Bus 360466
Location
Grainger County, Tennessee
Technology
Hydro: 32.0 MW
Total requested
32.0 MW
Study phase
Cluster Study
Queue status
Active
Entered queue
20 September 2024
Proposed online date
February 2028

Location

Marker shows the centre of Grainger County; the queue data does not give exact sites.

Power plants in Tennessee · Transmission lines in Tennessee

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem