United States › Grid › Interconnection queues

OTHER · MISO

Replacing 37 MW of natural gas generation with BESS at Joppa; Joppa

Replacing 37 MW of natural gas generation with BESS at Joppa; Joppa is a 37.0 MW other request in interconnection study in the MISO interconnection queue.

Queue statusIn planning
  1. PlanningQueued Dec 2022 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Dec 2024 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
R1029
Grid region
MISO (Midcontinent)
Connection point (POI)
Joppa 161kV Switchyard
Technology
Other: 37.0 MW · Battery
Total requested
37.0 MW
Queue status
Active
Entered queue
12 December 2022
Proposed online date
December 2024

Location

No county location in the queue data.

Power plants in · Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem