United States › Grid › Interconnection queues › Illinois

SOLAR · MISO

Solar project J2982, Warren County

Solar project J2982, Warren County is a 35.0 MW solar request in interconnection study in the MISO interconnection queue, in Warren County, Illinois, connecting to AMEREN ILLINOIS.

Queue statusIn planning
  1. PlanningQueued Sep 2022 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Sep 2023 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
J2982
Grid region
MISO (Midcontinent)
Utility / transmission owner
AMEREN ILLINOIS
Connection point (POI)
Line 6629 Monmouth 69 kV Switching Station
Location
Warren County, Illinois
Technology
Solar: 35.0 MW
Total requested
35.0 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: DPP 2; Post GIA Status: Not Started
Queue status
Active
Entered queue
14 September 2022
Proposed online date
September 2023

Location

Marker shows the centre of Warren County; the queue data does not give exact sites.

Power plants in Illinois · Transmission lines in Illinois

Other requests in Warren County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem