Battery storage projects in the connection queue

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown814219.0 GW in total
In planning609scoping or awaiting consent
Consented or building126closest to connecting
Built79connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

814 projects · page 8 of 17
ProjectCapacityStageConnection siteFrom
Wymondham Road Farm
Battery storage · Qair Renewables UK Limited
228 MWScoping North Anglia Connection Node A 132kV Substation
National Grid (England & Wales)
Oct 2034
Woodlands Farm BESS
Battery storage · Sky UK Development Limited
228 MWScoping East Kent Connection Node B 132Kv Substation
National Grid (England & Wales)
Oct 2036
Imperial Park BESS
Battery storage · Kona Asset 4 Limited
225 MWScoping Imperial Park 400kV Substation
National Grid (England & Wales)
Oct 2037
Lanehurst Farm BESS
Battery storage · Elgin Energy Es Co Limited
225 MWScoping Sussex and Romney Connection Node B 132kV Substation
National Grid (England & Wales)
Oct 2037
Ninfield BESS
Battery storage · Kona Energy Limited
225 MWScoping Sussex and Romney Connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2037
Ratcliffe on Soar
Battery storage · Uniper UK Limited
225 MWBuilt Ratcliffe-On-Soar 400kV Substation
National Grid (England & Wales)
Rhigos BESS
Battery storage · Kona Asset 4 Limited
225 MWScoping South Wales West Connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2037
Rhigos BESS
Battery storage · Enviromena Project Management UK Limited
221 MWScoping Rhigos B 400kV Substation
National Grid (England & Wales)
Oct 2037
Hurst BESS
Battery storage · Firstway Solar Ltd
212 MWScoping North Kent Connection Node C 400kV Substation
National Grid (England & Wales)
Oct 2038
Aberthaw PV & BESS Generation
Battery storage · REWE 12 Limited
200 MWScoping Aberthaw 275kV Substation
National Grid (England & Wales)
Oct 2029
Achies BESS
Battery storage · Igp Energy Storage 5 Limited
200 MWScoping New Spittal 275kV Substation
SSEN Transmission (north Scotland)
Oct 2037
Amersham Substation
Battery storage · Sandbrook Capital BES Ltd
200 MWScoping London North West Connection Node A 132kV Substation
National Grid (England & Wales)
Oct 2037
Auldhouse 200MW BESS
Battery storage · Apatura Project 29 Ltd
200 MWScoping Auldhouse 400kV Substation
SP Transmission (south Scotland)
Oct 2031
Beanacre BESS
Battery storage · Grenergy Renewables UK Limited
200 MWScoping Melksham B 400kV Substation
National Grid (England & Wales)
Sep 2037
Berkswell Energy Storage
Battery storage · Berkswell Battery Storage Limited
200 MWUnder Construction/Commissioning Berkswell 275kV Substation
National Grid (England & Wales)
Oct 2027
BESS Cilfynydd
Battery storage · Rewe 2 Limited
200 MWScoping Cilfynydd 400kV Substation
National Grid (England & Wales)
Jul 2029
BESS Harker
Battery storage · Rewe 4 Limited
200 MWConsents Approved Harker 400kV Substation
National Grid (England & Wales)
May 2031
BESS Swan
Battery storage · Rewe 3 Limited
200 MWScoping Swansea North 400kV Substation
National Grid (England & Wales)
Oct 2028
Biggleswade BESS
Battery storage · Harmony Bw Ltd
200 MWScoping Biggleswade 400kV Substation
National Grid (England & Wales)
Oct 2034
Blairgowrie BESS
Battery storage · Woodside BESS Ltd
200 MWScoping Blairgowrie BESS 132kV Substation
SSEN Transmission (north Scotland)
May 2030
Blanket’s Farm
Battery storage · Noventum Power Solar 9 Limited
200 MWScoping Warley 275kV Substation
National Grid (England & Wales)
Oct 2038
Broadford BESS
Battery storage · Field Devco Ltd
200 MWScoping Broadford 132kV Substation
SSEN Transmission (north Scotland)
Oct 2034
Carberry BESS (was Smeaton BESS)
Battery storage · Harmony Cbr Ltd
200 MWScoping Dalkeith 400kV Substation
SP Transmission (south Scotland)
Jun 2031
Clonmacate Farm BESS
Battery storage · GPC Project 11 Ltd
200 MWScoping Ayr 275/33kV
SP Transmission (south Scotland)
Oct 2030
Corriemoillie BESS
Battery storage · Field Corriemoillie Ltd
200 MWScoping Corriemoillie 132kV Substation
SSEN Transmission (north Scotland)
Sep 2029
Cowley Energy Storage
Battery storage · Bw Ess Development UK Limited
200 MWConsents Approved Cowley 400kV Substation
National Grid (England & Wales)
Jul 2028
Dalchork Farm
Battery storage · Qair Renewables UK Limited
200 MWScoping Dalchork 132kV Substation
SSEN Transmission (north Scotland)
Oct 2032
Dounreay BESS
Battery storage · Field Devco Ltd
200 MWScoping New Dounreay 400kV substation
SSEN Transmission (north Scotland)
Oct 2034
Drakelow BESS
Battery storage · Harmony Dl Ltd
200 MWConsents Approved Drakelow 400kV Substation
National Grid (England & Wales)
Dec 2029
Eggborough BESS
Battery storage · Fig Power Limited
200 MWScoping Leeds North Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2035
Ferrybridge B - NEL Hunter
Battery storage · UE 4 LTD
200 MWScoping Leeds North Connection Node C 132kV Substation
National Grid (England & Wales)
Oct 2035
Field Glenniston BESS
Battery storage · Field Devco Ltd
200 MWScoping Field Glenniston BESS 132Kv Substation
SP Transmission (south Scotland)
Oct 2032
Fife Battery Storage
Battery storage · Carlton Power Limited
200 MWScoping Westfield 132/33kV
SP Transmission (south Scotland)
Oct 2031
Fort Augustus BESS
Battery storage · Field Devco Ltd
200 MWScoping Fort Augustus 400kV
SSEN Transmission (north Scotland)
Oct 2035
FPE Ayr BESS
Battery storage · Future Power Enterprises Ltd
200 MWScoping Ayr 275/33kV
SP Transmission (south Scotland)
Oct 2037
Fyrish Battery Storage
Battery storage · Field Fyrish Ltd
200 MWScoping Fyrish 132kV Substation
SSEN Transmission (north Scotland)
Oct 2029
Galileo 14 Ltd
Battery storage · Galileo 14 Limited
200 MWScoping Staffordshire Connection Node C 400Kv Substation
National Grid (England & Wales)
Oct 2037
Galileo 15
Battery storage · Galileo 15 Limited
200 MWScoping South Wales West Connection Node B 400kV Substation
National Grid (England & Wales)
Dec 2036
Garscadden Park
Battery storage · Garscadden Park Limited
200 MWScoping Garscadden Park 275kV Substation
SP Transmission (south Scotland)
Oct 2033
Gartclash Farm BESS
Battery storage · South Plean Storage Facility Limited
200 MWScoping Denny North 275/132kV
SP Transmission (south Scotland)
Oct 2028
Gastard BESS
Battery storage · Siriusecodev (Gastard) Ltd
200 MWScoping Melksham B 132KV Substation
National Grid (England & Wales)
Nov 2037
GF Upper Boat
Battery storage · Pulse Clean Energy Spv Franklin Limited
200 MWScoping Upper Boat 275kV Substation
National Grid (England & Wales)
Oct 2028
Giffordland 200Mw Field BESS
Battery storage · Virmati Energy Ltd
200 MWScoping Giffordland 400/132kV
SP Transmission (south Scotland)
Apr 2033
Gresham House Mossmoran BESS
Battery storage · Mossmorran Energy Storage Limited
200 MWScoping Loch Gelly Collector 132Kv Substation
SP Transmission (south Scotland)
Oct 2031
Hawthorn BESS
Battery storage · Rewe 8 Limited
200 MWAwaiting Consents Wearside Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2035
Highview Hunterston East Cryobattery
Battery storage · Hvs Siteco Ltd
200 MWConsents Approved Hunterston East 400kV
SP Transmission (south Scotland)
Oct 2027
Hunterston Battery Storage Facility
Battery storage · Hunterston Grid 1 Ltd
200 MWConsents Approved Hunterston East 400kV substation
SP Transmission (south Scotland)
Mar 2028
Hunterston Energy Storage Facility
Battery storage · Hunterston Grid 1 Ltd
200 MWConsents Approved Ayrshire Grid 400kV Substation
SP Transmission (south Scotland)
Mar 2028
Hylton Bridge - Sunderland
Battery storage · Sse Enterprise Limited
200 MWScoping Wearside Connection Node B 2 400kV Substation
National Grid (England & Wales)
Oct 2039
Isenau Four
Battery storage · Isenau Energy Storage Resources Four Limited
200 MWScoping Corriemoillie 132/33kV Substation
SSEN Transmission (north Scotland)
Oct 2033
Page 8 of 17

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.