Grid infrastructure › Connection queue › Battery storage
BATTERY STORAGE · NGETWoodlands Farm BESS
Woodlands Farm BESS is a 228 MW battery storage project in planning, connecting to the National Grid (England & Wales) network at East Kent Connection Node B 132Kv Substation, with capacity due from October 2036. The connection agreement is held by Sky UK Development Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2036 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-004270
- Customer
- Sky UK Development Limited
- Technology
- Energy Storage System
- Total capacity
- 228 MW
- Change in this agreement
- +228 MW
- Capacity effective from
- 31 October 2036
- Connection site
- East Kent Connection Node B 132Kv Substation
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Embedded (connects through the local distribution network)
- NESO project status
- Scoping
- Connections reform gate
- Gate 1
Connection site
This project connects at a new substation (a “connection node”) that has not been built or located yet.
Projects connecting near East Kent Connection Node B · Grid map
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem