FPE Ayr BESS is a 200 MW battery storage project in planning, connecting to the SP Transmission (south Scotland) network at Ayr 275/33kV, with capacity due from October 2037. The connection agreement is held by Future Power Enterprises Ltd.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2037 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-004532
Customer
Future Power Enterprises Ltd
Technology
Energy Storage System
Total capacity
200 MW
Change in this agreement
+200 MW
Capacity effective from
30 October 2037
Connection site
Ayr 275/33kV
Transmission owner
SP Transmission (south Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Scoping

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Ayr Β· Grid map

Other projects at Ayr 275/33kV