🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

Grid infrastructure › Connection queue › Battery storage

BATTERY STORAGE · SPT

Holmston Farm Battery Energy Storage System

Holmston Farm Battery Energy Storage System is a 50 MW battery storage project built and connected, connecting to the SP Transmission (south Scotland) network at Ayr 275/33kV. The connection agreement is held by Field Holmston Ltd.

Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-002359
Customer
Field Holmston Ltd
Technology
Energy Storage System
Total capacity
50 MW
Already connected
50 MW
Connection site
Ayr 275/33kV
Transmission owner
SP Transmission (south Scotland)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Built
Connections reform gate
Gate 2

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Ayr · Grid map

Other projects at Ayr 275/33kV

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem