Grid infrastructure › Connection queue › Battery storage
BATTERY STORAGE · NGETBlanket’s Farm
Blanket’s Farm is a 200 MW battery storage project in planning, connecting to the National Grid (England & Wales) network at Warley 275kV Substation, with capacity due from October 2038. The connection agreement is held by Noventum Power Solar 9 Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2038 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-004469
- Customer
- Noventum Power Solar 9 Limited
- Technology
- Energy Storage System
- Total capacity
- 200 MW
- Change in this agreement
- +200 MW
- Capacity effective from
- 31 October 2038
- Connection site
- Warley 275kV Substation
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
- Connections reform gate
- Gate 1
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Other projects at Warley 275kV Substation
- Lebanon Farm 2 BESSBattery storage · 275 MW · Scoping
- Warley PV & BESSBattery storage · 250 MW · Scoping
- Codham Hall BESSBattery storage · 249 MW · Scoping
- Warley Battery Energy StorageBattery storage · 200 MW · Scoping
- WarleyBattery storage · 57 MW · Consents Approved
- Warley (tertiary)Solar + storage · 57 MW · Built
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem