Grid infrastructure βΊ Connection queue βΊ Solar + storage
SOLAR + STORAGE Β· NGETWarley (tertiary)
Warley (tertiary) is a 57 MW solar + storage project built and connected, connecting to the National Grid (England & Wales) network at Warley 275kV Substation. The connection agreement is held by Warley Green Limited.
Connection details
- NESO project number
- PRO-000555
- Customer
- Warley Green Limited
- Technology
- Energy Storage System, PV Array (Photo Voltaic/solar)
- Total capacity
- 57 MW
- Already connected
- 57 MW
- Connection site
- Warley 275kV Substation
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Built
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Other projects at Warley 275kV Substation
- Lebanon Farm 2 BESSBattery storage Β· 275 MW Β· Scoping
- Warley PV & BESSBattery storage Β· 250 MW Β· Scoping
- Codham Hall BESSBattery storage Β· 249 MW Β· Scoping
- Blanketβs FarmBattery storage Β· 200 MW Β· Scoping
- Warley Battery Energy StorageBattery storage Β· 200 MW Β· Scoping
- WarleyBattery storage Β· 57 MW Β· Consents Approved
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem