BESS Cilfynydd is a 200 MW battery storage project in planning, connecting to the National Grid (England & Wales) network at Cilfynydd 400kV Substation, with capacity due from July 2029. The connection agreement is held by Rewe 2 Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Jul 2029 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-002008
- Customer
- Rewe 2 Limited
- Technology
- Energy Storage System
- Total capacity
- 200 MW
- Change in this agreement
- +200 MW
- Capacity effective from
- 12 July 2029
- Connection site
- Cilfynydd 400kV Substation
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Other projects at Cilfynydd 400kV Substation
- Cilfynydd Green Energy CentreSolar + storage Β· 1.0 GW Β· Awaiting Consents
- Penrhiwdarren FarmBattery storage Β· 500 MW Β· Scoping
- CilfynyddSolar + storage Β· 400 MW Β· Awaiting Consents
- Cilfynydd Green Energy CentreSolar + storage Β· 400 MW Β· Awaiting Consents
- Cilfynydd BESSBattery storage Β· 350 MW Β· Scoping
- Cilfynydd 2Battery storage Β· 240 MW Β· Scoping
- Merthyr Solar and BatterySolar Β· 175 MW Β· Scoping
- Merthyr Solar and BatterySolar Β· 110 MW Β· Scoping
- Twyn Hywel CillfynyddOnshore wind Β· 108 MW Β· Scoping
- Cilfynydd Grid Stability ServicesOther Β· 0 MW Β· Consents Approved
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem