Grid infrastructure › Connection queue › Battery storage

BATTERY STORAGE · SPT

Giffordland 200Mw Field BESS

Giffordland 200Mw Field BESS is a 200 MW battery storage project in planning, connecting to the SP Transmission (south Scotland) network at Giffordland 400/132kV, with capacity due from April 2033. The connection agreement is held by Virmati Energy Ltd.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Apr 2033 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-005986
Customer
Virmati Energy Ltd
Technology
Energy Storage System
Total capacity
200 MW
Change in this agreement
+200 MW
Capacity effective from
30 April 2033
Connection site
Giffordland 400/132kV
Transmission owner
SP Transmission (south Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Scoping
Connections reform gate
Gate 1

Connection site

The connection site could not be placed on the map.

Projects connecting near Giffordland · Grid map

Other projects at Giffordland 400/132kV

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem