Hylton Bridge - Sunderland

Hylton Bridge - Sunderland is a 200 MW battery storage project in planning, connecting to the National Grid (England & Wales) network at Wearside Connection Node B 2 400kV Substation, with capacity due from October 2039. The connection agreement is held by Sse Enterprise Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2039 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-005802
Customer
Sse Enterprise Limited
Technology
Demand, Energy Storage System
Total capacity
200 MW
Change in this agreement
+200 MW
Capacity effective from
30 October 2039
Connection site
Wearside Connection Node B 2 400kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Scoping

Connection site

This project connects at a new substation (a “connection node”) that has not been built or located yet.

Projects connecting near Wearside Connection Node B · Grid map

Other projects at Wearside Connection Node B 2 400kV Substation