Completed queue projects in the USA (2023 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown8710.2 GW
Active in queue298.6 GW1,249 requests
Agreement signed34.6 GW168 requests
Withdrawn2,063551.8 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

87 requests Β· page 1 of 2
ProjectCapacityStatusLocationRegionQueuedOnline
Central Alabama Generating Station
Gas
951 MWOperating Autauga, ALSoutheast Jan 20232025
Talbot County
Gas
726 MWOperating Talbot, GASoutheast Dec 2023
BC Smith
Gas
547 MWOperating Effingham, GASoutheast Sep 20232024
Effingham (aka McCall Road)
Gas
540 MWOperating Effingham, GASoutheast Dec 2023
Sewell Creek
Gas
518 MWOperating Polk, GASoutheast Dec 2023
Walton Bainbridge (aka E. Bainbr)
Gas
500 MWOperating Decatur, GASoutheast Dec 2023
Baconton
Gas
500 MWOperating Mitchell, GASoutheast Dec 2023
LGE Washington (aka Tiger Creek)
Gas
480 MWOperating Washington, GASoutheast Dec 2023
Talbot County
Gas
440 MWOperating Southeast Dec 2023
Hartwell Energy
Gas
354 MWOperating Hart, GASoutheast Dec 2023
Doyle
Gas
345 MWOperating Walton, GASoutheast Dec 2023
Evelyn Battery Energy Storage System
Battery storage Β· Evelyn Energy Storage LLC
221 MWOperating ERCOT Jan 20232025
LGE Walton - Monroe
Gas
220 MWOperating Walton, GASoutheast Dec 2023
Smarr (aka Rumble Road)
Gas
218 MWOperating Monroe, GASoutheast Dec 2023
Doyle 115
Gas
195 MWOperating Southeast Dec 2023
Longbow BESS
Other Β· Longbow BESS, LLC
181 MWOperating Brazoria, TXERCOT Jan 20232024
Onshore wind project SP107, Coconino County
Onshore wind
161 MWOperating Coconino, AZWest Jun 2023target 2024
Bocanova Power
Battery storage Β· Bocanova Power LLC
151 MWOperating ERCOT Jun 20232025
Walton Discover (aka Goat Rock)
Gas
150 MWOperating Lee, GASoutheast Dec 2023
SR DeSoto I
Solar
138 MWOperating Lee, GASoutheast Dec 20232022
SR Clay
Solar
125 MWOperating Clay, GASoutheast Dec 20232022
Dougherty County Solar
Solar
120 MWOperating Dougherty, GASoutheast Dec 2023
SR Snipesville II
Solar
118 MWOperating Jeff Davis, GASoutheast Dec 2023
Gas project 330, Polk County
Gas Β· Duke Energy Florida, LLC
115 MWOperating Polk, FLSoutheast Jul 20232024
SR Arlington II
Solar
109 MWOperating Early, GASoutheast Dec 2023
SR Snipesville III
Solar
103 MWOperating Jeff Davis, GASoutheast Dec 20232023
Brotman U1 U2 Power Station
Gas
102 MWOperating Brazoria, TXERCOT Mar 20232023
SR Lumpkin
Solar
100 MWOperating Stewart, GASoutheast Dec 2023
Hawk Road (aka Dynegy)
Gas
100 MWOperating Heard, GASoutheast Dec 2023
Sowega
Gas
100 MWOperating Mitchell, GASoutheast Dec 2023
SR Snipesville I
Solar
90.0 MWOperating Jeff Davis, GASoutheast Dec 2023
Battery storage project GEN-2023-SR18, Grady County
Battery storage
80.0 MWOperating Grady, OKSPP Jun 20232025
Onshore wind project GEN-2023-GR3, Quay County
Onshore wind
80.0 MWOperating Quay, NMSPP Jun 20232024
Lancaster Solar
Solar
80.0 MWOperating Calhoun, GASoutheast Dec 2023
Chattahoochee (Wansley)
Gas
78.0 MWOperating Heard, GASoutheast Dec 2023
SR Terrell County Solar
Solar
77.0 MWOperating Terrell, GASoutheast Dec 2023
Solar project 106, Hillsborough County
Solar
74.5 MWOperating Hillsborough, FLSoutheast Jun 2023target 2025
Gas project 334, Polk County
Gas Β· Duke Energy Florida, LLC
72.0 MWOperating Polk, FLSoutheast Jul 20232024
SR Cedar Springs
Solar
70.0 MWOperating Early, GASoutheast Dec 20232022
Battery storage project GEN-2023-SR13, Garfield County
Battery storage
70.0 MWOperating Garfield, OKSPP Jan 20232025
SR Perry
Solar
68.0 MWOperating Houston, GASoutheast Dec 2023
Coal project 453, Yellowstone County
Coal
57.0 MWOperating Yellowstone, MTWest Nov 2023
SR Hazlehurst II (aka S. Loving)
Solar
53.0 MWOperating Jeff Davis, GASoutheast Dec 2023
Dublin Biomass -GPS
Other
45.0 MWOperating Laurens, GASoutheast Dec 2023
SR Hazlehurst III
Solar
44.0 MWOperating Jeff Davis, GASoutheast Dec 2023
Weyerhaeuser TG#2
Other
42.0 MWOperating Macon, GASoutheast Dec 2023
Coal project 439, Rosebud County
Coal
40.5 MWOperating Rosebud, MTWest Jan 2023
Dublin Biomass - SPFT
Gas
38.0 MWOperating Laurens, GASoutheast Dec 2023
Simon Solar Farm
Solar
30.0 MWOperating Walton, GASoutheast Dec 2023
Odom Solar (aka Peachtree Solar)
Solar
22.0 MWOperating Colquitt, GASoutheast Dec 2023
Page 1 of 2

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)