BATTERY STORAGE Β· ERCOTBocanova Power
Bocanova Power is a 151 MW battery storage request built and operating in the ERCOT interconnection queue.
Request details
- Queue ID
- 25INR0467
- Grid region
- ERCOT (Texas)
- Developer
- Bocanova Power LLC
- Connection point (POI)
- 39030 TNALVIN 138kV
- Technology
- Battery: 151 MW
- Total requested
- 151 MW
- Study phase
- IA
- Queue status
- Operational
- Entered queue
- 7 June 2023
- Agreement signed
- 26 February 2024
- Proposed online date
- August 2025
- Came online
- August 2025
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem