SOLAR · SOUTHEASTDougherty County Solar
Dougherty County Solar is a 120 MW solar request built and operating in the Southeast interconnection queue, in Dougherty County, Georgia, connecting to Georgia Transmission.
Request details
- Queue ID
- GI-083
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Georgia Transmission
- Connection point (POI)
- Pecan City 115 kV Sub
- Location
- Dougherty County, Georgia
- Technology
- Solar: 120 MW
- Total requested
- 120 MW
- Study phase
- IA Executed
- Queue status
- Operational
- Entered queue
- 31 December 2023
Location
Marker shows the centre of Dougherty County; the queue data does not give exact sites.
Other requests in Dougherty County
- Solar + storage project 25-IC-1383, Dougherty CountySolar + storage · 199 MW · in study
- Dougherty County BESSBattery storage · 120 MW · in study
- Albany Green EnergyOther · 44.0 MW · built
- MCLB SolarSolar · 31.0 MW · built
- Solar project IC-472, Dougherty CountySolar · 200 MW · withdrawn
- Solar project IC-405, Dougherty CountySolar · 29.4 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem