United States › Grid › Interconnection queues › Texas
OCTARY USA · INTERCONNECTION QUEUESQueue requests in study in Texas (2021 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Texpo Gas · Oklaunion Power Station, LLC |
680 MW | In study |
| Dovetail Solar 3 Solar + storage · Hecate Energy Dovetail Solar Holdings LLC |
666 MW | In study |
| Dovetail Solar 1 Solar + storage · Hecate Energy Dovetail Solar 1 LLC |
666 MW | In study |
| Dovetail Solar 2 Solar + storage · Hecate Energy Dovetail Solar 2 LLC |
666 MW | In study |
| Hiru Solar Solar + storage · Hecate Energy Hazel LLC |
604 MW | In study |
| Bayside Solar Solar |
509 MW | Paused / redesign |
| Dovetail Storage Solar + storage · Hecate Energy Dovetail Storage LLC |
509 MW | In study |
| Outpost Storage Solar + storage · Hecate Energy Outpost Storage LLC |
508 MW | In study |
| Harley Hand Storage Solar + storage · Hecate Energy Harley Hand Solar LLC |
503 MW | In study |
| Calpine Guadalupe Peakers Gas · Guadalupe Peaking Energy Center, LLC |
450 MW | In study |
| Poco Trail Solar Solar · Eastern Trail Solar Center, LLC |
439 MW | In study |
| BRP Artemis BESS Battery storage · BRP Artemis BESS LLC |
411 MW | In study |
| BRP Snowdon BESS Battery storage · BRP SNOWDON BESS LLC |
411 MW | In study |
| BRP Mekong BESS Battery storage · BRP Mekong BESS LLC |
410 MW | In study |
| Beacon Storage Battery storage · AES Distributed Energy, Inc |
409 MW | In study |
| Sigma Storage Battery storage · AES Distributed Energy, Inc |
408 MW | In study |
| Grasshopper Solar Solar · Grasshopper Solar LLC |
408 MW | In study |
| Merope BESS Battery storage · BRP Merope BESS LLC |
402 MW | In study |
| Solar + storage project GEN-2021-090, Yoakum County Solar + storage |
400 MW | In study |
| BRP Aras BESS Battery storage · BRP Aras BESS LLC |
304 MW | In study |
| Pachanga Wind Onshore wind · Pachanga Wind LLC |
300 MW | In study |
| SP Jaguar BESS Other · PP Jaguar BESS LLC |
300 MW | Paused / redesign |
| Possum Kingdom Solar Solar + storage · PK Solar, LLC |
262 MW | In study |
| Maleza Solar II Solar + storage · Brush Solar, LLC |
255 MW | In study |
| Bayside II Solar Solar |
253 MW | Paused / redesign |
| Tiger Storage Battery storage |
251 MW | Paused / redesign |
| Cascade Storage Battery storage |
250 MW | Paused / redesign |
| Campsey Wind Onshore wind · RWE Clean Energy Development, LLC |
238 MW | In study |
| DeSpain Solar Project Solar · Gransolar Texas Thirteen LLC |
236 MW | In study |
| Utley Solar Solar |
222 MW | Paused / redesign |
| Goodalta Solar Solar · GoodAlta Power Center LLC |
221 MW | In study |
| Val Vista Grid BESS 2 Battery storage · Val Vista Grid, LLC |
211 MW | In study |
| Two Rivers Solar Solar · Two Rivers Solar, LLC |
209 MW | In study |
| Alwest BESS Battery storage · Castleman Power |
209 MW | In study |
| Umbra (Stockyard) Solar Solar |
208 MW | Paused / redesign |
| Liberty Senate Energy Storage 1 Battery storage · Senate Solar LLC |
207 MW | In study |
| Alamosa Storage Battery storage |
207 MW | Paused / redesign |
| BRP Hemera BESS Battery storage · BRP Hemera BESS LLC |
207 MW | In study |
| Sultan Solar Solar |
206 MW | Paused / redesign |
| Crios BESS Battery storage · BRP Crios BESS LLC |
206 MW | In study |
| Trivor BESS Battery storage · BRP Trivor BESS LLC |
206 MW | In study |
| BRP Triton BESS Battery storage · BRP Triton BESS LLC |
205 MW | In study |
| Utica Solar Solar |
205 MW | Paused / redesign |
| Cornwall Solar Solar |
205 MW | Paused / redesign |
| Marcelina Storage Battery storage · Marcelina Solar, LLC |
203 MW | In study |
| Masroor Storage Other · Masroor Energy Storage LLC |
203 MW | Paused / redesign |
| Bee Branch IA Battery storage · Tidwell Prairie LLC |
203 MW | In study |
| Sanjac BESS Battery storage · Castleman Power |
202 MW | In study |
| BRP Nile BESS Battery storage · BRP Nile BESS LLC |
202 MW | In study |
| Snap Jaw BESS Other · Moccasin Pointe Grid, LLC |
201 MW | Paused / redesign |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)