United States › Grid › Interconnection queues › Texas
BATTERY STORAGE · ERCOTBRP Snowdon BESS
BRP Snowdon BESS is a 411 MW battery storage request in interconnection study in the ERCOT interconnection queue, in Briscoe County, Texas.
Queue statusIn planning
- PlanningQueued Sep 2021 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2028 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 23INR0330
- Grid region
- ERCOT (Texas)
- Developer
- BRP SNOWDON BESS LLC
- Connection point (POI)
- 23914 Tule Canyon Substation 345kV
- Location
- Briscoe County, Texas
- Technology
- Battery: 411 MW
- Total requested
- 411 MW
- Study phase
- SS Completed, FIS Started, No IA
- Queue status
- Active
- Entered queue
- 15 September 2021
- Proposed online date
- December 2028
Location
Marker shows the centre of Briscoe County; the queue data does not give exact sites.
Other requests in Briscoe County
- Commodus WindOnshore wind · 641 MW · in study
- Commodus SolarSolar · 502 MW · in study
- Silverton SolarSolar · 410 MW · in study
- Silver Canyon Wind AOnshore wind · 200 MW · withdrawn
- Tecovas 1 WOnshore wind · 200 MW · withdrawn
- Tecovas 2 WOnshore wind · 200 MW · withdrawn
- Solar project GEN-2022-043, Briscoe CountySolar · 200 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem