ONSHORE WIND Β· ERCOT

Tecovas 1 W

Tecovas 1 W is a 200 MW onshore wind request withdrawn in the ERCOT interconnection queue, in Briscoe County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2015 (completed)
  2. Withdrawn / abandonedDec 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
16INR0117
Grid region
ERCOT (Texas)
Developer
Engie
Connection point (POI)
79503 Tule Canyon 345kV
Location
Briscoe County, Texas
Technology
Wind: 200 MW
Total requested
200 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
22 June 2015
Proposed online date
October 2023
Withdrawn
December 2020

Location

Marker shows the centre of Briscoe County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Briscoe County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem