United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· SPPSolar project GEN-2022-043, Briscoe County
Solar project GEN-2022-043, Briscoe County is a 200 MW solar request withdrawn in the SPP interconnection queue, in Briscoe County, Texas, connecting to SPS.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2022 (completed)
- Withdrawn / abandonedNov 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2022-043
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- SPS
- Connection point (POI)
- Swisher 230kV Substation
- Location
- Briscoe County, Texas
- Technology
- Solar: 200 MW
- Total requested
- 200 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 23 June 2022
- Proposed online date
- December 2027
- Withdrawn
- November 2023
Location
Marker shows the centre of Briscoe County; the queue data does not give exact sites.
Other requests in Briscoe County
- Commodus WindOnshore wind Β· 641 MW Β· in study
- Commodus SolarSolar Β· 502 MW Β· in study
- BRP Snowdon BESSBattery storage Β· 411 MW Β· in study
- Silverton SolarSolar Β· 410 MW Β· in study
- Silver Canyon Wind AOnshore wind Β· 200 MW Β· withdrawn
- Tecovas 1 WOnshore wind Β· 200 MW Β· withdrawn
- Tecovas 2 WOnshore wind Β· 200 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem