Solar project GEN-2022-043, Briscoe County

Solar project GEN-2022-043, Briscoe County is a 200 MW solar request withdrawn in the SPP interconnection queue, in Briscoe County, Texas, connecting to SPS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2022 (completed)
  2. Withdrawn / abandonedNov 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2022-043
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
SPS
Connection point (POI)
Swisher 230kV Substation
Location
Briscoe County, Texas
Technology
Solar: 200 MW
Total requested
200 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
23 June 2022
Proposed online date
December 2027
Withdrawn
November 2023

Location

Marker shows the centre of Briscoe County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Briscoe County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem