Silver Canyon Wind A

Silver Canyon Wind A is a 200 MW onshore wind request withdrawn in the ERCOT interconnection queue, in Briscoe County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2007 (completed)
  2. Withdrawn / abandonedApr 2019 (project stopped here)
  3. ConsentedJun 2016 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
12INR0002a
Grid region
ERCOT (Texas)
Developer
EDP Renewables
Connection point (POI)
79503 Tule Canyon 345kV
Location
Briscoe County, Texas
Technology
Wind: 200 MW
Total requested
200 MW
Study phase
IA
Queue status
Withdrawn
Entered queue
2 January 2007
Agreement signed
22 June 2016
Proposed online date
October 2020
Withdrawn
April 2019

Location

Marker shows the centre of Briscoe County; the queue data does not give exact sites.