ONSHORE WIND · ERCOTSilver Canyon Wind A
Silver Canyon Wind A is a 200 MW onshore wind request withdrawn in the ERCOT interconnection queue, in Briscoe County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2007 (completed)
- Withdrawn / abandonedApr 2019 (project stopped here)
- ConsentedJun 2016 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 12INR0002a
- Grid region
- ERCOT (Texas)
- Developer
- EDP Renewables
- Connection point (POI)
- 79503 Tule Canyon 345kV
- Location
- Briscoe County, Texas
- Technology
- Wind: 200 MW
- Total requested
- 200 MW
- Study phase
- IA
- Queue status
- Withdrawn
- Entered queue
- 2 January 2007
- Agreement signed
- 22 June 2016
- Proposed online date
- October 2020
- Withdrawn
- April 2019
Location
Marker shows the centre of Briscoe County; the queue data does not give exact sites.
Other requests in Briscoe County
- Commodus WindOnshore wind · 641 MW · in study
- Commodus SolarSolar · 502 MW · in study
- BRP Snowdon BESSBattery storage · 411 MW · in study
- Silverton SolarSolar · 410 MW · in study
- Tecovas 1 WOnshore wind · 200 MW · withdrawn
- Tecovas 2 WOnshore wind · 200 MW · withdrawn
- Solar project GEN-2022-043, Briscoe CountySolar · 200 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem