United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in Texas (2021 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown426,352 MW
Active in queue41.1 GW215 requests
Agreement signed16.3 GW91 requests
Withdrawn7712.5 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

42 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Five Wells Solar
Solar Β· Five Wells Solar Center LLC
323 MWOperating Bell, TXERCOT Feb 20212023
Remy Jade Power Station
Gas Β· Remy Jade Generating, LLC
306 MWOperating Harris, TXERCOT Aug 20212024
Rodeo Ranch Energy Storage
Other Β· Rodeo Ranch Energy Storage, LLC
301 MWOperating Reeves, TXERCOT Sep 20212023
Tanzanite Storage
Battery storage Β· Tanzanite Energy Storage LLC
266 MWOperating Henderson, TXERCOT Aug 20212025
Anole BESS
Battery storage Β· Anole Energy Storage, LLC
247 MWOperating Dallas, TXERCOT Jun 20212025
True North Solar
Solar Β· True North Solar LLC
239 MWOperating Falls, TXERCOT Jan 20212024
Shamrock
Onshore wind Β· Shamrock Interconnection LLC
224 MWOperating Crockett, TXERCOT Feb 20212023
Five Wells BESS
Other Β· Five Wells Storage LLC
221 MWOperating Bell, TXERCOT Feb 20212024
Stillhouse Solar
Solar Β· Stillhouse Solar LLC
211 MWOperating Bell, TXERCOT Nov 20212025
Holy ESS
Other Β· Citadel BESS LLC
209 MWOperating Harris, TXERCOT Nov 20212024
Callisto I Energy Center
Other Β· Callisto I energy center LLC
206 MWOperating Harris, TXERCOT Mar 20212024
Mercury II Solar
Solar + storage Β· Mercury II Solar, LLC
206 MWOperating Hill, TXERCOT Jan 20212023
Anemoi Energy Storage
Other Β· Anemoi Energy Storage, LLC
205 MWOperating Hidalgo, TXERCOT Sep 20212024
Corazon Storage
Solar + storage Β· Guajillo Energy Storage LLC
205 MWOperating Webb, TXERCOT Aug 20212025
Ebony Energy Storage
Other Β· Ebony Energy Storage, LLC
204 MWOperating Comal, TXERCOT Feb 20212024
Turquoise Storage
Other Β· BT Cunningham Storage, LLC
196 MWOperating Hunt, TXERCOT Mar 20212023
Blevins Storage
Battery storage Β· Blevins Solar, LLC
181 MWOperating Falls, TXERCOT Feb 20212025
Hart Wind
Onshore wind Β· Hart Wind Project LLC
163 MWOperating Castro, TXERCOT Oct 20212025
Wolf Tank Storage
Other Β· Lobo Storage
156 MWOperating Webb, TXERCOT Jul 20212023
Desert Willow BESS
Battery storage Β· Desert Willow Energy Storage, LLC
154 MWOperating Ellis, TXERCOT Feb 20212025
Timberwolf BESS 2
Other Β· Crane 2 BESS, LLC
150 MWOperating Crane, TXERCOT Mar 20212023
Sheep Creek Storage
Other Β· Longhorn Storage LLC
142 MWOperating Callahan, TXERCOT Jul 20212024
Pioneer DJ Wind
Onshore wind Β· Pioneer Hutt Wind Energy LLC
140 MWOperating Midland, TXERCOT Oct 20212025
Blue Summit I Repower
Wind + storage
135 MWOperating Wilbarger, TXERCOT Oct 20212024
Giga Texas Energy Storage
Other Β· Giga Texas Energy, LLC.
131 MWOperating Travis, TXERCOT Apr 20212024
Anchor Wind II
Onshore wind
129 MWOperating Eastland, TXERCOT Apr 20212024
Connolly Storage
Other Β· BT Connolly Storage, LLC
125 MWOperating Wise, TXERCOT Oct 20212024
Great Kiskadee Storage
Battery storage Β· Great Kiskadee Storage, LLC
103 MWOperating Hidalgo, TXERCOT Jan 20212025
Angelo Storage
Other Β· Angelo Storage, LLC
103 MWOperating Tom Green, TXERCOT Nov 20212024
St. Gall I Energy Storage
Other Β· St. Gall Energy Storage I LLC
103 MWOperating Pecos, TXERCOT Apr 20212024
River Bend
Other Β· Brazos Bend BESS LLC
102 MWOperating Fort Bend, TXERCOT Aug 20212024
St. Gall II Energy Storage
Battery storage Β· St. Gall Energy Storage LLC
100 MWOperating Pecos, TXERCOT Apr 20212025
Coral Storage
Other Β· Copperhead Solar, LLC
99.0 MWOperating Falls, TXERCOT Feb 20212023
Dogfish BESS
Battery storage Β· Dogfish ESS Assets, LLC
78.2 MWOperating Pecos, TXERCOT Mar 20212025
House Mountain
Other Β· House Mountain LLC
63.0 MWOperating Brewster, TXERCOT Jan 20212023
Cross Trails Storage
Battery storage Β· Cross Trails Energy Storage Project, LLC
58.3 MWOperating Scurry, TXERCOT Nov 20212025
Gransolar Texas One
Solar Β· Gransolar Texas One, LLC
50.8 MWOperating Milam, TXERCOT Mar 20212024
Teco GTG2
Gas Β· Thermal Energy Corp.
50.0 MWOperating Harris, TXERCOT Nov 20212024
Bastrop Energy Center AGP repower Phase II
Gas
21.0 MWOperating Bastrop, TXERCOT Apr 20212022
Bastrop Energy Center AGP repower Phase I
Gas
21.0 MWOperating Bastrop, TXERCOT Apr 20212022
Anchor Wind IV
Onshore wind
19.3 MWOperating Eastland, TXERCOT Dec 20212024
Ebony Energy Storage Repowering
Battery storage
5.0 MWOperating Comal, TXERCOT Feb 20212025

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)