🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › Texas

OCTARY USA · INTERCONNECTION QUEUES

Completed queue projects in Texas (2020 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown609,770 MW
Active in queue28.9 GW115 requests
Agreement signed14.9 GW54 requests
Withdrawn558,621 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

60 requests · page 1 of 2
ProjectCapacityStatusLocationRegionQueuedOnline
Hornet Solar
Solar · Hornet Solar LLC
602 MWOperating Swisher, TXERCOT Feb 20202024
Parliament Solar
Solar · Parliament Solar LLC
485 MWOperating Waller, TXERCOT Jun 20202025
White Mesa 2 Wind
Onshore wind · White Mesa Wind, LLC
348 MWOperating Crockett, TXERCOT Sep 20202022
Andromeda Solar
Solar · IP Renewable Energy Holdings LLC
327 MWOperating Scurry, TXERCOT Sep 20202024
Jade Solar
Solar · IP RENEWABLE ENERGY HOLDINGS LLC
327 MWOperating Scurry, TXERCOT Jun 20202024
Bright Arrow Solar
Solar · RWE Solar Development, LLC
305 MWOperating Hopkins, TXERCOT Feb 20202023
Peregrine Solar
Solar + storage · SP-Peregrine Solar LLC
301 MWOperating Goliad, TXERCOT Jan 20202024
Inertia Wind
Onshore wind · Inertia Wind Project, LLC
301 MWOperating Haskell, TXERCOT Jun 20202023
Stampede Solar
Solar · Stampede Solar Project, LLC
256 MWOperating Hopkins, TXERCOT Nov 20202025
Mandorla Solar
Solar · Ben Milam Solar 2
254 MWOperating Milam, TXERCOT Jan 20202024
Halo Solar
Solar · Ben Milam Solar 3
254 MWOperating Bell, TXERCOT Jan 20202024
Sparta Solar
Solar · Sparta Solar
252 MWOperating Bee, TXERCOT May 20202024
Porter Solar
Solar · Porter Solar, LLC
246 MWOperating Denton, TXERCOT Jan 20202025
Fence Post Solar
Solar · Fence Post Solar Project, LLC
237 MWOperating Navarro, TXERCOT Nov 20202025
Libra BESS
Other · Libra Storage LLC
206 MWOperating Guadalupe, TXERCOT Jun 20202024
Cachi BESS
Battery storage · BRP Cachi BESS LLC
206 MWOperating Guadalupe, TXERCOT Aug 20202025
Tidwell Prairie Storage 1
Battery storage · Tidwell Prairie LLC
204 MWOperating Robertson, TXERCOT Jul 20202025
Crossett Power Batt
Other · Crossett Power Management LLC
203 MWOperating Crane, TXERCOT Jun 20202022
Rowland Solar II
Solar · Cutlass Solar II LLC
203 MWOperating Fort Bend, TXERCOT Dec 20202024
Estonian Solar
Solar
203 MWOperating Delta, TXERCOT Apr 20202025
Hydra BESS
Other · BRP Hydra BESS LLC
201 MWOperating Pecos, TXERCOT Jul 20202024
Paleo BESS
Other · BRP Paleo BESS LLC
201 MWOperating Hale, TXERCOT Apr 20202024
Dickens BESS
Other · BRP INTERMEDIATECO I LLC
201 MWOperating Dickens, TXERCOT Apr 20202024
Brotman Power Station
Gas · Brotman Generating, LLC
199 MWOperating Brazoria, TXERCOT Oct 20202023
Pavo BESS
Other · BRP Pavo BESS LLC
176 MWOperating Pecos, TXERCOT Jul 20202024
Carina BESS
Battery storage · BRP Carina BESS LLC
154 MWOperating Nueces, TXERCOT Jun 20202025
Chillingham Storage
Battery storage · Chillingham Storage LLC
154 MWOperating Bell, TXERCOT Sep 20202025
Beachwood Power Station (Mark One)
Gas · WattBridge Energy, LLC
153 MWOperating Brazoria, TXERCOT Jul 20202022
Beachwood Power Station Phase 2 (Mark One)
Gas · WattBridge Energy, LLC
153 MWOperating Brazoria, TXERCOT Jul 20202023
Coral Solar
Solar · Copperhead Solar, LLC
152 MWOperating Falls, TXERCOT Jun 20202023
Juno Solar (Phase II)
Solar
147 MWOperating Borden, TXERCOT Mar 20202021
Roadrunner Crossing Wind II SLF
Onshore wind · Roadrunner Crossing Wind Farm, LLC
127 MWOperating Eastland, TXERCOT Jul 20202024
Limousin Oak Storage
Other · KCE TX 15, LLC
105 MWOperating Grimes, TXERCOT May 20202024
Hummingbird Storage
Other · KCE TX 10, LLC
104 MWOperating Denton, TXERCOT May 20202024
Bright Arrow Storage
Other · RWE Solar Development, LLC
104 MWOperating Hopkins, TXERCOT Mar 20202023
Burksol BESS
Other · Burksol LLC
103 MWOperating Dickens, TXERCOT Oct 20202024
Beachwood II Power Station
Gas · Mark One II LLC
102 MWOperating Brazoria, TXERCOT Dec 20202024
PES 2 Power Station
Gas · HO CLARKE GENERATING LLC
102 MWOperating Harris, TXERCOT Jul 20202021
Estonian Storage
Other
102 MWOperating Delta, TXERCOT Apr 20202024
Madero Unit2
Other · Ignacio Grid, LLC
102 MWOperating Hidalgo, TXERCOT Oct 20202023
Sun Valley BESS
Other · Sun Valley Solar LLC
101 MWOperating Hill, TXERCOT Oct 20202023
Swoose II
Other · Swoose II, LLC
101 MWOperating Ward, TXERCOT Mar 20202022
Flower Valley II Batt
Other · Flower Valley II, LLC
101 MWOperating Reeves, TXERCOT Mar 20202022
Ellis Solar
Solar · Ellis Solar, LLC
81.0 MWOperating Ellis, TXERCOT Jan 20202023
Colorado Bend I Expansion
Gas · Colorado Bend I Power, LLC
78.0 MWOperating Wharton, TXERCOT Sep 20202023
Antlia BESS
Battery storage · BRP Antlia BESS LLC
72.4 MWOperating Val Verde, TXERCOT Jun 20202025
Stampede BESS
Other · Stampede Solar Project, LLC
72.4 MWOperating Hopkins, TXERCOT Nov 20202023
Fence Post BESS
Other · Fence Post Solar Project, LLC
72.2 MWOperating Navarro, TXERCOT Nov 20202023
Dileo Solar
Solar · Elawan Dileo Solar LLC
71.4 MWOperating Bosque, TXERCOT Jun 20202023
Mustang Creek Storage
Other · Ganado Solar, LLC
70.5 MWOperating Jackson, TXERCOT Jan 20202024
Page 1 of 2

Capacity in the queue by state

Click a state to drill down.

By grid region

ISO/RTO markets and the non-ISO West and Southeast.

Requests by year joined

Capacity of requests in this view, by the year they entered the queue. Click a year.

20102025

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)