OTHER Β· ERCOTLibra BESS
Libra BESS is a 206 MW other request built and operating in the ERCOT interconnection queue, in Guadalupe County, Texas.
Request details
- Queue ID
- 22INR0366
- Grid region
- ERCOT (Texas)
- Developer
- Libra Storage LLC
- Connection point (POI)
- 5133 Elm Creek 345kV
- Location
- Guadalupe County, Texas
- Technology
- Other: 206 MW
- Total requested
- 206 MW
- Study phase
- IA
- Queue status
- Operational
- Entered queue
- 25 June 2020
- Agreement signed
- 16 February 2022
- Proposed online date
- April 2024
- Came online
- April 2024
Location
Marker shows the centre of Guadalupe County; the queue data does not give exact sites.
Other requests in Guadalupe County
- Rockridge SolarSolar Β· 211 MW Β· agreement signed
- Nockenut Springs Solar 2Solar Β· 203 MW Β· agreement signed
- Nockenut Springs Solar 1Solar Β· 203 MW Β· agreement signed
- Rio Nogales CT1 Rotor ReplacementGas Β· 3.1 MW Β· agreement signed
- CPS Rio Nogales CT301 Rotor ReplacementGas Β· 3.1 MW Β· agreement signed
- CPS Rio Nogales CT201 Rotor ReplacementGas Β· 3.1 MW Β· agreement signed
- Calpine Guadalupe PeakersGas Β· 450 MW Β· in study
- Guadalupe Battery Storage ProjectBattery storage Β· 211 MW Β· in study
- Ruedrich BESSBattery storage Β· 201 MW Β· in study
- Aster SolarSolar Β· 161 MW Β· in study
- Roble BESSBattery storage Β· 154 MW Β· in study
- Utica SolarSolar Β· 205 MW Β· suspended