United States โบ Grid โบ Interconnection queues โบ Massachusetts
OCTARY USA ยท INTERCONNECTION QUEUESWithdrawn queue requests in Massachusetts (2023 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Offshore wind Offshore wind |
1,309 MW | Withdrawn / abandoned |
| Offshore Wind Offshore wind |
882 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
529 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
301 MW | Withdrawn / abandoned |
| Battery Storage Increase (QP1238) Battery storage |
301 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
300 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
271 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
262 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
250 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
241 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
238 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
202 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
200 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
196 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
190 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
176 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
172 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
160 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
152 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
152 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
152 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
151 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
151 MW | Withdrawn / abandoned |
| Battery Storage Increase (QP1362) Battery storage |
141 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
122 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
115 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
109 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
103 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
102 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
100 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
100 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
100 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
92.4 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
76.0 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
69.4 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
50.0 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
41.2 MW | Withdrawn / abandoned |
| (Offshore wind Increase (Q700 +Q1154) Offshore wind |
38.8 MW | Withdrawn / abandoned |
| EE Group @ Blandford Solar + storage |
28.9 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
20.0 MW | Withdrawn / abandoned |
| NG DG @ Sykes Road Battery storage |
10.0 MW | Withdrawn / abandoned |
| NG NEMA Group DER Study Battery storage |
10.0 MW | Withdrawn / abandoned |
| EE Group @ Doreen Solar + storage |
9.1 MW | Withdrawn / abandoned |
| EE Valley DG Group Study Solar |
8.0 MW | Withdrawn / abandoned |
| EE Group @ Southwick Solar + storage |
7.0 MW | Withdrawn / abandoned |
| NG NEMA Group DER Study Solar + storage |
5.0 MW | Withdrawn / abandoned |
| Individual @ Montague Battery storage |
5.0 MW | Withdrawn / abandoned |
| NG NEMA Group DER Study Battery storage |
5.0 MW | Withdrawn / abandoned |
| Individual @ Piper Other |
4.1 MW | Withdrawn / abandoned |
| Individual @ Partridge Solar + storage |
4.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines ยท Planned power plants (EIA)