United States โ€บ Grid โ€บ Interconnection queues โ€บ California

OCTARY USA ยท INTERCONNECTION QUEUES

Withdrawn queue requests in California (2014 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown659,719 MW
Active in queue450 MW7 requests
Agreement signed450 MW7 requests
Withdrawn659,719 MW never built

Map

Loading requestsโ€ฆ
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

65 requests ยท page 1 of 2
ProjectCapacityStatusLocationRegionQueuedOnline
Mira Loma Hybrid Power Project
Gas
910 MWWithdrawn / abandoned San Bernardino, CACAISO Apr 2014target 2020
Viejo Hybrid Power
Gas
910 MWWithdrawn / abandoned Riverside, CACAISO Apr 2014target 2019
Santa Ana Energy Center
Gas
700 MWWithdrawn / abandoned Orange, CACAISO Apr 2014target 2018
Birch Street Generation Facility (Fka Birch Street- Simple Cycle)
Gas
625 MWWithdrawn / abandoned Orange, CACAISO Apr 2014target 2018
Grand Ave Generation Facility (Fka Grand Ave Simple Cycle)
Gas
625 MWWithdrawn / abandoned Orange, CACAISO Apr 2014target 2018
Nci Hybrid Power
Solar + storage
538 MWWithdrawn / abandoned San Diego, CACAISO Apr 2014target 2019
Cci Hybrid Power
Gas
508 MWWithdrawn / abandoned San Diego, CACAISO Apr 2014target 2019
NCC Hybrid Power
Gas
444 MWWithdrawn / abandoned San Diego, CACAISO Apr 2014target 2019
Grand Ave- Combined Cycle
Gas
378 MWWithdrawn / abandoned Orange, CACAISO Apr 2014target 2018
Birch Street - Combined Cycle
Gas
378 MWWithdrawn / abandoned Orange, CACAISO Apr 2014target 2018
Diablo Energy Facility
Gas
309 MWWithdrawn / abandoned Contra Costa, CACAISO Apr 2014target 2017
Mission Rock Energy Center (Fka Mission Rock Energy Center Flex)
Gas
305 MWWithdrawn / abandoned Ventura, CACAISO Apr 2014target 2019
Alamitos Energy Storage
Battery storage
300 MWWithdrawn / abandoned Los Angeles, CACAISO Apr 2014target 2018
New Heca
Gas
300 MWWithdrawn / abandoned Kern, CACAISO Apr 2014target 2020
Jupiter Solar
Solar
250 MWWithdrawn / abandoned Riverside, CACAISO Apr 2014target 2018
Johanna Energy Center (Fka Johanna Energy Center LMS)
Gas
220 MWWithdrawn / abandoned Orange, CACAISO Apr 2014target 2019
SLW (Fka Shu'Luuk Wind)
Onshore wind
160 MWWithdrawn / abandoned San Diego, CACAISO Apr 2014target 2017
Quartzite Solar 7
Solar
150 MWWithdrawn / abandoned Riverside, CACAISO Apr 2014target 2019
Miguel Energy Storage
Battery storage
150 MWWithdrawn / abandoned San Diego, CACAISO Apr 2014target 2016
Kearny Hybrid Power
Solar + storage
120 MWWithdrawn / abandoned San Diego, CACAISO Apr 2014target 2019
Grand Ave - Battery System
Battery storage
118 MWWithdrawn / abandoned Orange, CACAISO Apr 2014target 2018
Birch Street - Battery System
Battery storage
118 MWWithdrawn / abandoned Orange, CACAISO Apr 2014target 2018
Vermillion
Solar
100 MWWithdrawn / abandoned Riverside, CACAISO Apr 2014target 2017
High Desert Solar PV
Solar
90.0 MWWithdrawn / abandoned San Bernardino, CACAISO Apr 2014target 2018
Pandora Solar
Solar
60.0 MWWithdrawn / abandoned Kern, CACAISO Apr 2014target 2018
SGS Fremont
Battery storage
50.0 MWWithdrawn / abandoned Alameda, CACAISO Apr 2014target 2019
SKY Valley Wind
Onshore wind
50.0 MWWithdrawn / abandoned Solano, CACAISO Apr 2014target 2017
Rose Meadow Wind Bank
Battery storage
50.0 MWWithdrawn / abandoned Kern, CACAISO Apr 2014target 2022
SGS Livermore (Fka SGS South San Francisco)
Battery storage
50.0 MWWithdrawn / abandoned San Mateo, CACAISO Apr 2014target 2019
Puerta Solar Center
Solar
49.0 MWWithdrawn / abandoned Fresno, CACAISO Aug 2014target 2017
Geothermal project Q46, Mono County
Geothermal
44.0 MWWithdrawn / abandoned Mono, CAWest Jan 2014target 2017
BCS Energy Storage
Solar + storage
40.0 MWWithdrawn / abandoned Imperial, CACAISO Apr 2014target 2015
Shingle Springs Grid Stabilization Project
Battery storage
40.0 MWWithdrawn / abandoned El Dorado, CACAISO Apr 2014target 2016
Otay Mesa Energy Center Agp
Gas
35.0 MWWithdrawn / abandoned San Diego, CACAISO Apr 2014target 2016
Victor Grid Stabilization Project
Battery storage
30.0 MWWithdrawn / abandoned San Joaquin, CACAISO Apr 2014target 2016
Colinas De Oro
Battery storage
30.0 MWWithdrawn / abandoned Alameda, CACAISO Apr 2014target 2021
Tesla Wind Bank
Battery storage
30.0 MWWithdrawn / abandoned Alameda, CACAISO Apr 2014target 2016
Weber Grid Stabilization Project
Battery storage
25.0 MWWithdrawn / abandoned San Joaquin, CACAISO Apr 2014target 2016
Big Potrero
Solar
20.0 MWWithdrawn / abandoned San Diego, CACAISO Apr 2014target 2016
High Noon
Solar
20.0 MWWithdrawn / abandoned Kings, CACAISO Apr 2014target 2016
Mesa Rojo
Solar
20.0 MWWithdrawn / abandoned San Diego, CACAISO Apr 2014target 2016
Pleasant Grove Grid Stabilization Project
Battery storage
20.0 MWWithdrawn / abandoned Placer, CACAISO Apr 2014target 2016
Magellan Solar
Solar
20.0 MWWithdrawn / abandoned Kern, CACAISO Apr 2014target 2018
Diablo Energy Storage
Battery storage
20.0 MWWithdrawn / abandoned Contra Costa, CACAISO Apr 2014target 2016
Coyote Creek Energy Storage
Battery storage
20.0 MWWithdrawn / abandoned Santa Clara, CACAISO Apr 2014target 2020
Stonecrop
Solar
20.0 MWWithdrawn / abandoned Fresno, CACAISO Apr 2014target 2019
Broken Spoke
Solar
20.0 MWWithdrawn / abandoned Kern, CACAISO Apr 2014target 2016
South Lake Solar
Solar + storage
20.0 MWWithdrawn / abandoned Fresno, CACAISO Apr 2014target 2021
Umbarger Evergreen Energy Storage
Battery storage
20.0 MWWithdrawn / abandoned Santa Clara, CACAISO Apr 2014target 2016
Puma Fork
Solar
20.0 MWWithdrawn / abandoned Kern, CACAISO Apr 2014target 2016
Page 1 of 2

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines ยท Planned power plants (EIA)