United States › Grid › Interconnection queues › California

SOLAR + STORAGE · CAISO

South Lake Solar

South Lake Solar is a 20.0 MW solar + storage request withdrawn in the CAISO interconnection queue, in Fresno County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2014 (completed)
  2. Withdrawn / abandonedMay 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1030
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Schindler-Huron-Gates Tap 70kV
Location
Fresno County, California
Technology
Solar: 15.0 MW · Battery: 5.0 MW
Total requested
20.0 MW
Service type
Energy only (ERIS)
Study phase
Executed
Queue status
Withdrawn
Entered queue
30 April 2014
Proposed online date
April 2021
Withdrawn
May 2020

Location

Marker shows the centre of Fresno County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Fresno County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem