GAS Β· CAISOCci Hybrid Power
Cci Hybrid Power is a 508 MW gas request withdrawn in the CAISO interconnection queue, in San Diego County, California, connecting to SDGE.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2014 (completed)
- Withdrawn / abandonedJul 2014 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1044
- Grid region
- CAISO (California)
- Utility / transmission owner
- SDGE
- Connection point (POI)
- Mission-San Luis Rey 230 kV line
- Location
- San Diego County, California
- Technology
- Gas: 448 MW Β· Battery: 60.0 MW
- Total requested
- 508 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 30 April 2014
- Proposed online date
- June 2019
- Withdrawn
- July 2014
Location
Marker shows the centre of San Diego County; the queue data does not give exact sites.
Power plants in California Β· Transmission lines in California
Other requests in San Diego County
- Mount Laguna Wind 2Onshore wind Β· 400 MW Β· agreement signed
- East Field Energy StorageBattery storage Β· 313 MW Β· agreement signed
- Nighthawk StorageBattery storage Β· 300 MW Β· agreement signed
- Tule WindWind + storage Β· 259 MW Β· agreement signed
- Desert Jewel StorageBattery storage Β· 206 MW Β· agreement signed
- Kettle Solar OneSolar + storage Β· 180 MW Β· agreement signed
- Fallbrook Energy StorageBattery storage Β· 69.6 MW Β· agreement signed
- Ventasso Energy StorageBattery storage Β· 50.8 MW Β· agreement signed
- North Johnson Energy CenterBattery storage Β· 50.0 MW Β· agreement signed
- Chula Vista Energy Center 2Battery storage Β· 50.0 MW Β· agreement signed
- Starlight SolarSolar + storage Β· 37.4 MW Β· agreement signed
- Escondido Energy Center 2Battery storage Β· 33.0 MW Β· agreement signed
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem