BATTERY STORAGE · CAISO

Umbarger Evergreen Energy Storage

Umbarger Evergreen Energy Storage is a 20.0 MW battery storage request withdrawn in the CAISO interconnection queue, in Santa Clara County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2014 (completed)
  2. Withdrawn / abandonedApr 2015 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1023
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Evergreen Substation 60kV
Location
Santa Clara County, California
Technology
Battery: 20.0 MW
Total requested
20.0 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
30 April 2014
Proposed online date
August 2016
Withdrawn
April 2015

Location

Marker shows the centre of Santa Clara County; the queue data does not give exact sites.