Alamitos Energy Storage

Alamitos Energy Storage is a 300 MW battery storage request withdrawn in the CAISO interconnection queue, in Los Angeles County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2014 (completed)
  2. Withdrawn / abandonedMar 2015 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1077
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Alamitos Switching Station 220kV
Location
Los Angeles County, California
Technology
Battery: 300 MW
Total requested
300 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
30 April 2014
Proposed online date
March 2018
Withdrawn
March 2015

Location

Marker shows the centre of Los Angeles County; the queue data does not give exact sites.