United States β€Ί Grid β€Ί Interconnection queues β€Ί California

SOLAR Β· CAISO

Jupiter Solar

Jupiter Solar is a 250 MW solar request withdrawn in the CAISO interconnection queue, in Riverside County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2014 (completed)
  2. Withdrawn / abandonedJun 2016 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1070
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Red Bluff Substation 230 kV
Location
Riverside County, California
Technology
Solar: 250 MW
Total requested
250 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
30 April 2014
Proposed online date
December 2018
Withdrawn
June 2016

Location

Marker shows the centre of Riverside County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in Riverside County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem