United States โบ Grid โบ Interconnection queues
OCTARY USA ยท INTERCONNECTION QUEUESQueue requests in study in PJM (Mid-Atlantic, Midwest) (2019 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Cvow 2, Oss 2 โรรฌ T2G07 Offshore wind ยท Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) |
836 MW | In study |
| Cvow 1, Oss 1 - T1L11 Offshore wind ยท Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) |
833 MW | In study |
| Cvow 3, Oss 3 โรรฌ T3G15 Offshore wind ยท Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) |
820 MW | In study |
| Chesterfield CT Units 1 and 2 Gas ยท Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) |
569 MW | In study |
| Steward Creek Solar Solar ยท Steward Creek Solar, LLC |
300 MW | In study |
| Three Lakes Solar Solar + storage ยท Three Lakes Solar LLC |
300 MW | In study |
| Black Diamond Solar Solar ยท Black Diamond Solar Power, LLC |
299 MW | In study |
| Vermilion Grove Wind Onshore wind ยท Vermilion Grove Wind, LLC |
255 MW | In study |
| Axton Solar Solar |
201 MW | Paused / redesign |
| South Dixon Solar Solar ยท Deriva Energy Solar, LLC |
200 MW | In study |
| Gipper Wind Farm Onshore wind ยท Gipper Wind Farm, LLC |
191 MW | In study |
| Martin County Solar Project Solar |
190 MW | Paused / redesign |
| Erie East Energy Battery storage |
160 MW | Paused / redesign |
| Bowfin Solar Solar + storage |
150 MW | Paused / redesign |
| Bright Stalk Generating Facility Onshore wind ยท Lexington Chenoa Wind Farm LLC |
150 MW | In study |
| Plano Skies Energy Center Solar ยท Plano Skies Energy Center, LLC |
150 MW | In study |
| Enclave Solar Energy Center Solar |
149 MW | Paused / redesign |
| Kensington Solar Solar |
145 MW | Paused / redesign |
| Shorebird Solar Solar |
117 MW | Paused / redesign |
| Plano Skies Energy Center Solar ยท Plano Skies Energy Center, LLC |
100 MW | In study |
| Clermont County Solar Project Solar |
100 MW | Paused / redesign |
| Nottingham Solar Solar |
100 MW | Paused / redesign |
| Riverstart Solar Park V Solar |
100 MW | Paused / redesign |
| Yadkins Energy Center Battery storage ยท Yadkins Energy Center, LLC |
100 MW | In study |
| Madison Solar 1 Solar ยท AEUG Madison Solar, LLC |
100 MW | In study |
| Bedington Energy Facility Solar |
100 MW | Paused / redesign |
| Rocky Ford Solar Energy Center Solar |
90.0 MW | Paused / redesign |
| Granite Hill Solar Solar |
70.0 MW | Paused / redesign |
| Morrow County Solar II Solar |
64.0 MW | Paused / redesign |
| Dover Solar Facility Solar |
55.0 MW | Paused / redesign |
| Hardin Energy Center โรรฌ Storage II Battery storage |
55.0 MW | Paused / redesign |
| Dover Solar Solar |
55.0 MW | Paused / redesign |
| Clermont County Solar Project Battery storage |
52.2 MW | Paused / redesign |
| Maple Hill-Fiddlers 1 SP (Bear Rock) Solar ยท CPV Maple Hill Solar, LLC |
50.0 MW | In study |
| Switchgrass Solar 1 Solar |
49.0 MW | Paused / redesign |
| Amelia Energy Facility Solar ยท Amelia Energy Facility, LLC |
41.0 MW | In study |
| Woodstock Solar Solar |
40.0 MW | Paused / redesign |
| Golden Aster Solar Energy Center Battery storage |
40.0 MW | Paused / redesign |
| Henry County Solar Solar |
40.0 MW | Paused / redesign |
| Cottontail Solar 7 Solar |
35.0 MW | Paused / redesign |
| Meadow Forge Solar Energy Center Solar |
33.0 MW | Paused / redesign |
| Concho Solar I Solar |
20.0 MW | Paused / redesign |
| Momentum Gratz Battery storage |
20.0 MW | Paused / redesign |
| Mountain Holly Solar |
20.0 MW | Paused / redesign |
| HU-Pauls Solar |
20.0 MW | Paused / redesign |
| Montour 1 Solar |
20.0 MW | Paused / redesign |
| Dover Solar Solar |
20.0 MW | Paused / redesign |
| HU-Logging Solar |
20.0 MW | Paused / redesign |
| Charles County Solar I Solar |
20.0 MW | Paused / redesign |
| SunEast Hooversville Solar Solar |
20.0 MW | Paused / redesign |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)46 ยท 17.8 GW
- PJM (Mid-Atlantic, Midwest)60 ยท 7,820 MW
- ERCOT (Texas)38 ยท 5,908 MW
- NYISO (New York)31 ยท 2,705 MW
- CAISO (California)3 ยท 2,352 MW
- Southeast (non-ISO utilities)12 ยท 1,469 MW
- MISO (Midcontinent)7 ยท 1,168 MW
- SPP (Southwest Power Pool)5 ยท 558 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines ยท Planned power plants (EIA)