United States › Grid › Interconnection queues › Michigan

SOLAR + STORAGE · PJM

Three Lakes Solar

Three Lakes Solar is a 300 MW solar + storage request in interconnection study in the PJM interconnection queue, in St. Joseph County, Michigan, connecting to AEP.

Queue statusIn planning
  1. PlanningQueued Sep 2019 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Oct 2022 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
AF1-176
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEP
Developer
Three Lakes Solar LLC
Connection point (POI)
Corey 138 kV
Location
St. Joseph County, Michigan
Technology
Solar: 300 MW · Battery
Total requested
300 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study
Queue status
Active
Entered queue
25 September 2019
Proposed online date
October 2022

Location

Marker shows the centre of St. Joseph County; the queue data does not give exact sites.

Power plants in Michigan · Transmission lines in Michigan

Other requests in St. Joseph County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem