United States βΊ Grid βΊ Interconnection queues βΊ Michigan
SOLAR + STORAGE Β· PJMSolar + storage project AE2-266, St. Joseph County
Solar + storage project AE2-266, St. Joseph County is a 199 MW solar + storage request withdrawn in the PJM interconnection queue, in St. Joseph County, Michigan, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2019 (completed)
- Withdrawn / abandonedApr 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AE2-266
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Corey 138kV
- Location
- St. Joseph County, Michigan
- Technology
- Solar: 199 MW Β· Battery
- Total requested
- 199 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 28 March 2019
- Proposed online date
- September 2021
- Withdrawn
- April 2019
Location
Marker shows the centre of St. Joseph County; the queue data does not give exact sites.
Other requests in St. Joseph County
- Three Lakes SolarSolar + storage Β· 300 MW Β· in study
- Solar project J3908, St. Joseph CountySolar Β· 196 MW Β· in study
- Solar project J3844, St. Joseph CountySolar Β· 150 MW Β· in study
- Solar project AI2-144, St. Joseph CountySolar Β· 36.0 MW Β· in study
- Solar + storage project AE2-265, St. Joseph CountySolar + storage Β· 150 MW Β· withdrawn
- Solar project AG2-474, St. Joseph CountySolar Β· 150 MW Β· withdrawn
- Solar project J1609, St. Joseph CountySolar Β· 125 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem