Solar + storage project AE2-265, St. Joseph County

Solar + storage project AE2-265, St. Joseph County is a 150 MW solar + storage request withdrawn in the PJM interconnection queue, in St. Joseph County, Michigan, connecting to AEP.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2019 (completed)
  2. Withdrawn / abandonedApr 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AE2-265
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEP
Connection point (POI)
Corey 138 kV
Location
St. Joseph County, Michigan
Technology
Solar: 150 MW Β· Battery
Total requested
150 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
28 March 2019
Proposed online date
September 2021
Withdrawn
April 2019

Location

Marker shows the centre of St. Joseph County; the queue data does not give exact sites.

Power plants in Michigan Β· Transmission lines in Michigan

Other requests in St. Joseph County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem