SOLAR · PJMBedington Energy Facility
Bedington Energy Facility is a 100 MW solar request suspended in the PJM interconnection queue, in Frederick County, Maryland, connecting to APS.
Queue statusPaused / redesign
- PlanningQueued Apr 2019 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Oct 2025 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- AE2-333
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- APS
- Connection point (POI)
- Bedington 138 kV
- Location
- Frederick County, Maryland
- Technology
- Solar: 100 MW
- Total requested
- 100 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Suspended
- Entered queue
- 1 April 2019
- Proposed online date
- October 2025
Location
Marker shows the centre of Frederick County; the queue data does not give exact sites.
Other requests in Frederick County
- Solar + storage project AH2-262, Frederick CountySolar + storage · 17.0 MW · in study
- Legore Bridge Solar Center FacilitySolar · 20.0 MW · built
- Biggs Ford Solar FacilitySolar · 15.0 MW · built
- Mount St. Mary's PV ParkSolar · 14.0 MW · built
- Frederick Road SolarSolar · 9.0 MW · built
- Reichs LFOther · 2.0 MW · built
- Gas project G50, Frederick CountyGas · 910 MW · withdrawn
- Gas project G00_W39, Frederick CountyGas · 668 MW · withdrawn
- Catoctin CCGas · 640 MW · withdrawn
- Gas project E05_W25, Frederick CountyGas · 620 MW · withdrawn
- Solar project AC1-139, Frederick CountySolar · 102 MW · withdrawn
- Solar project AC2-178, Frederick CountySolar · 100 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem