United States βΊ Grid βΊ Interconnection queues βΊ Maryland
GAS Β· PJMGas project G50, Frederick County
Gas project G50, Frederick County is a 910 MW gas request withdrawn in the PJM interconnection queue, in Frederick County, Maryland, connecting to PEPCO.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2001 (completed)
- Withdrawn / abandonedMay 2002 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G50
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PEPCO
- Connection point (POI)
- Dickerson 230kV
- Location
- Frederick County, Maryland
- Technology
- Gas: 910 MW
- Total requested
- 910 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 31 July 2001
- Proposed online date
- December 2005
- Withdrawn
- May 2002
Location
Marker shows the centre of Frederick County; the queue data does not give exact sites.
Other requests in Frederick County
- Solar + storage project AH2-262, Frederick CountySolar + storage Β· 17.0 MW Β· in study
- Bedington Energy FacilitySolar Β· 100 MW Β· suspended
- Legore Bridge Solar Center FacilitySolar Β· 20.0 MW Β· built
- Biggs Ford Solar FacilitySolar Β· 15.0 MW Β· built
- Mount St. Mary's PV ParkSolar Β· 14.0 MW Β· built
- Frederick Road SolarSolar Β· 9.0 MW Β· built
- Reichs LFOther Β· 2.0 MW Β· built
- Gas project G00_W39, Frederick CountyGas Β· 668 MW Β· withdrawn
- Catoctin CCGas Β· 640 MW Β· withdrawn
- Gas project E05_W25, Frederick CountyGas Β· 620 MW Β· withdrawn
- Solar project AC1-139, Frederick CountySolar Β· 102 MW Β· withdrawn
- Solar project AC2-178, Frederick CountySolar Β· 100 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem