SOLAR Β· PJMMorrow County Solar II
Morrow County Solar II is a 64.0 MW solar request suspended in the PJM interconnection queue, in Morrow County, Ohio, connecting to ATSI.
Queue statusPaused / redesign
- PlanningQueued Sep 2019 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Mar 2026 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- AF1-122
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ATSI
- Connection point (POI)
- Cardington-Liberty 69 kV
- Location
- Morrow County, Ohio
- Technology
- Solar: 64.0 MW
- Total requested
- 64.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Suspended
- Entered queue
- 17 September 2019
- Proposed online date
- March 2026
Location
Marker shows the centre of Morrow County; the queue data does not give exact sites.
Other requests in Morrow County
- Blossom SolarSolar Β· 88.0 MW Β· agreement signed
- Blossom SolarSolar Β· 56.0 MW Β· agreement signed
- Battery storage project AH2-217, Morrow CountyBattery storage Β· 100 MW Β· in study
- Solar project AH1-282, Morrow CountySolar Β· 49.9 MW Β· in study
- Solar project AH2-009, Morrow CountySolar Β· 40.0 MW Β· in study
- Crossroads Solar ISolar Β· 20.0 MW Β· in study
- Solar project AG2-057, Morrow CountySolar Β· 10.0 MW Β· in study
- Onshore wind project V2-023, Morrow CountyOnshore wind Β· 251 MW Β· withdrawn
- Battery storage project AH1-765, Morrow CountyBattery storage Β· 205 MW Β· withdrawn
- Onshore wind project V2-022, Morrow CountyOnshore wind Β· 201 MW Β· withdrawn
- Onshore wind project V2-042A_AT2, Morrow CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project J057, Morrow CountyOnshore wind Β· 200 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem