Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Atlas Solar + storage |
2,074 MW | Withdrawn / abandoned |
| Gemini Wind North Onshore wind |
2,006 MW | Withdrawn / abandoned |
| Porthos Solar Solar + storage |
1,800 MW | Withdrawn / abandoned |
| Iron Hills Pumped Storage Battery storage |
1,407 MW | Withdrawn / abandoned |
| Sunvale Solar Farm Solar + storage |
1,200 MW | Withdrawn / abandoned |
| Mercator Solar + storage |
1,037 MW | Withdrawn / abandoned |
| Pitchfork Energy Solar + storage |
1,024 MW | Withdrawn / abandoned |
| Descendant Ranch 2 Solar + storage |
1,024 MW | Withdrawn / abandoned |
| Castle Wind Offshore Offshore wind |
576 MW | Withdrawn / abandoned |
| Rockfish Storage 1 Battery storage |
510 MW | Withdrawn / abandoned |
| Rockfish Storage 2 Battery storage |
510 MW | Withdrawn / abandoned |
| San Vicente Energy Storage Facility Battery storage |
500 MW | Withdrawn / abandoned |
| Cortes Battery storage |
500 MW | Withdrawn / abandoned |
| Sageberry Solar Solar + storage |
404 MW | Withdrawn / abandoned |
| Silverwing Solar + storage |
312 MW | Withdrawn / abandoned |
| Key Storage 2 Battery storage |
309 MW | Withdrawn / abandoned |
| Casy Solar Solar + storage |
308 MW | Withdrawn / abandoned |
| Mavericks Battery storage |
300 MW | Withdrawn / abandoned |
| Placid Solar + storage |
270 MW | Withdrawn / abandoned |
| Poseidon Solar + storage |
256 MW | Withdrawn / abandoned |
| Arrow Solar + storage |
255 MW | Withdrawn / abandoned |
| Longspur 11 Solar + storage |
234 MW | Withdrawn / abandoned |
| Sagebrush Solar 5 Solar |
224 MW | Withdrawn / abandoned |
| Hood 2 Solar |
220 MW | Withdrawn / abandoned |
| Hood 3 Solar |
220 MW | Withdrawn / abandoned |
| Heartland 3 Solar + storage |
206 MW | Withdrawn / abandoned |
| Del Rancho Solar + storage |
205 MW | Withdrawn / abandoned |
| Green Mezzo Battery storage |
204 MW | Withdrawn / abandoned |
| Hudson Solar 2 Solar + storage |
204 MW | Withdrawn / abandoned |
| Black Diamond Energy Storage 2 Battery storage |
200 MW | Withdrawn / abandoned |
| Moorhen Energy Storage Battery storage |
200 MW | Withdrawn / abandoned |
| Big Bear Wind Onshore wind |
199 MW | Withdrawn / abandoned |
| Tepona Off-Shore Wind Offshore wind |
162 MW | Withdrawn / abandoned |
| Stargaze Solar BESS Solar |
154 MW | Withdrawn / abandoned |
| Limon Energy Park Solar + storage |
153 MW | Withdrawn / abandoned |
| Falcon Energy Center Battery storage |
151 MW | Withdrawn / abandoned |
| Windcharger ESS Battery storage |
150 MW | Withdrawn / abandoned |
| Highline Solar Energy Center Solar + storage |
120 MW | Withdrawn / abandoned |
| Hood 1 Solar |
110 MW | Withdrawn / abandoned |
| DRY Creek Solar Solar |
110 MW | Withdrawn / abandoned |
| Dernopi Solar Solar |
103 MW | Withdrawn / abandoned |
| Stephen Solar |
103 MW | Withdrawn / abandoned |
| Poleline Solar Energy Center Solar + storage |
102 MW | Withdrawn / abandoned |
| Mammoth Energy Storage Battery storage |
101 MW | Withdrawn / abandoned |
| Pintail Energy Storage Battery storage |
100 MW | Withdrawn / abandoned |
| Temettate Advanced Caes Battery storage |
100 MW | Withdrawn / abandoned |
| Mcgrath Energy Center 1 Battery storage |
100 MW | Withdrawn / abandoned |
| Hydaspes Solar + storage |
82.0 MW | Withdrawn / abandoned |
| Windy Wash Solar Solar |
79.0 MW | Withdrawn / abandoned |
| Gonzaga Ridge Wind Farm 3 Onshore wind |
76.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)306 Β· 50.5 GW
- PJM (Mid-Atlantic, Midwest)311 Β· 46.6 GW
- MISO (Midcontinent)165 Β· 28.2 GW
- Southeast (non-ISO utilities)248 Β· 28.2 GW
- CAISO (California)67 Β· 21.7 GW
- SPP (Southwest Power Pool)92 Β· 16.8 GW
- ERCOT (Texas)77 Β· 15.0 GW
- NYISO (New York)74 Β· 11.2 GW
- ISO-NE (New England)84 Β· 8,151 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)