SOLAR + STORAGE · CAISO

Hydaspes

Hydaspes is a 82.0 MW solar + storage request withdrawn in the CAISO interconnection queue, in Stanislaus County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2018 (completed)
  2. Withdrawn / abandonedAug 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1558
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Miller #1 115 kV Line
Location
Stanislaus County, California
Technology
Solar: 40.6 MW · Battery: 41.4 MW
Total requested
82.0 MW
Service type
Energy only (ERIS)
Study phase
In Progress
Queue status
Withdrawn
Entered queue
15 April 2018
Proposed online date
December 2022
Withdrawn
August 2023

Location

Marker shows the centre of Stanislaus County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Stanislaus County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem