Windcharger ESS

Windcharger ESS is a 150 MW battery storage request withdrawn in the CAISO interconnection queue, in Solano County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2018 (completed)
  2. Withdrawn / abandonedApr 2021 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1492
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Birds Landing Substation 230kV
Location
Solano County, California
Technology
Battery: 150 MW
Total requested
150 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
16 April 2018
Proposed online date
December 2021
Withdrawn
April 2021

Location

Marker shows the centre of Solano County; the queue data does not give exact sites.