Temettate Advanced Caes

Temettate Advanced Caes is a 100 MW battery storage request withdrawn in the CAISO interconnection queue, in San Luis Obispo County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2018 (completed)
  2. Withdrawn / abandonedFeb 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1490
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Mesa 230kV
Location
San Luis Obispo County, California
Technology
Battery: 100 MW
Total requested
100 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
16 April 2018
Proposed online date
June 2024
Withdrawn
February 2019

Location

Marker shows the centre of San Luis Obispo County; the queue data does not give exact sites.