United States β€Ί Grid β€Ί Interconnection queues β€Ί California

ONSHORE WIND Β· CAISO

Gemini Wind North

Gemini Wind North is a 2,006 MW onshore wind request withdrawn in the CAISO interconnection queue, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2018 (completed)
  2. Withdrawn / abandonedApr 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1474
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Diablo Canyon Power Plant 500kV
Location
California
Technology
Wind: 2,006 MW
Total requested
2,006 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
16 April 2018
Proposed online date
March 2025
Withdrawn
April 2019

Location

No county location in the queue data.

Power plants in California Β· Transmission lines in California

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem