πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί California

BATTERY STORAGE Β· CAISO

Green Mezzo

Green Mezzo is a 204 MW battery storage request withdrawn in the CAISO interconnection queue, in Solano County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2018 (completed)
  2. Withdrawn / abandonedMar 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1476
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Birds Landing Switchyard 230kV
Location
Solano County, California
Technology
Battery: 204 MW
Total requested
204 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
16 April 2018
Proposed online date
December 2022
Withdrawn
March 2019

Location

Marker shows the centre of Solano County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in Solano County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem