OFFSHORE WIND · CAISOTepona Off-Shore Wind
Tepona Off-Shore Wind is a 162 MW offshore wind request withdrawn in the CAISO interconnection queue, in Humboldt County, California, connecting to PGAE.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2018 (completed)
- Withdrawn / abandonedAug 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1491
- Grid region
- CAISO (California)
- Utility / transmission owner
- PGAE
- Connection point (POI)
- Humboldt 115 kV
- Location
- Humboldt County, California
- Technology
- Offshore Wind: 162 MW
- Total requested
- 162 MW
- Service type
- Energy only (ERIS)
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 16 April 2018
- Proposed online date
- October 2034
- Withdrawn
- August 2025
Location
Marker shows the centre of Humboldt County; the queue data does not give exact sites.
Power plants in California · Transmission lines in California
Other requests in Humboldt County
- Humboldt Bay Power Plant Repowering ProjectGas · 146 MW · built
- Intrepid EnergyWind + storage · 1,887 MW · withdrawn
- Tempest GenerationWind + storage · 1,887 MW · withdrawn
- Wellhead Power HumboldtGas · 167 MW · withdrawn
- Capetown 3 HybridWind + storage · 158 MW · withdrawn
- Humboldt Energy Facility (Agile Energy)Gas · 147 MW · withdrawn
- Capetown HybridOnshore wind · 135 MW · withdrawn
- Capetown 2 HybridWind + storage · 106 MW · withdrawn
- Bear River Wind FarmOnshore wind · 100 MW · withdrawn
- Redwood House Wind Power PlantOnshore wind · 72.0 MW · withdrawn
- Bear River Wind Farm Q=117Onshore wind · 70.0 MW · withdrawn
- Bear River Ridge Wind FarmOnshore wind · 50.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem