United States › Grid › Interconnection queues › California

ONSHORE WIND · CAISO

Capetown Hybrid

Capetown Hybrid is a 135 MW onshore wind request withdrawn in the CAISO interconnection queue, in Humboldt County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2016 (completed)
  2. Withdrawn / abandonedMar 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1269
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Bridgeville 115 kV
Location
Humboldt County, California
Technology
Wind: 135 MW
Total requested
135 MW
Service type
Energy only (ERIS)
Study phase
Executed
Queue status
Withdrawn
Entered queue
2 May 2016
Proposed online date
September 2022
Withdrawn
March 2020

Location

Marker shows the centre of Humboldt County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Humboldt County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem