United States › Grid › Interconnection queues › California

WIND + STORAGE · CAISO

Tempest Generation

Tempest Generation is a 1,887 MW wind + storage request withdrawn in the CAISO interconnection queue, in Humboldt County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2019 (completed)
  2. Withdrawn / abandonedFeb 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1559
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Round Mountain Substation 500kV
Location
Humboldt County, California
Technology
Wind: 1,568 MW · Battery: 319 MW
Total requested
1,887 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
15 April 2019
Proposed online date
October 2025
Withdrawn
February 2020

Location

Marker shows the centre of Humboldt County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Humboldt County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem