🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › California

ONSHORE WIND · CAISO

Bear River Wind Farm

Bear River Wind Farm is a 100 MW onshore wind request withdrawn in the CAISO interconnection queue, in Humboldt County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2006 (completed)
  2. Withdrawn / abandonedAug 2011 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
105
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Between Rio Del Junction and Bridgeville
Location
Humboldt County, California
Technology
Wind: 100 MW
Total requested
100 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
4 May 2006
Proposed online date
October 2009
Withdrawn
August 2011

Location

Marker shows the centre of Humboldt County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Humboldt County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem