OCTARY USA · INTERCONNECTION QUEUESCompleted queue projects in ERCOT (Texas) — page 8
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Burksol BESS Other · Burksol LLC |
103 MW | |
| Spanish Crown Solar · BPL Crown Solar |
103 MW | |
| Al Pastor BESS Other · Al Pastor BESS LLC |
103 MW | |
| Great Kiskadee Storage Battery storage · Great Kiskadee Storage, LLC |
103 MW | |
| Golinda Solar Solar · BPL Sol Solar |
103 MW | |
| Angelo Storage Other · Angelo Storage, LLC |
103 MW | |
| St. Gall I Energy Storage Other · St. Gall Energy Storage I LLC |
103 MW | |
| Gambit Batt Other · Gambit Energy Storage |
102 MW | |
| Keechi Wind 138 kV Joplin Onshore wind · RES Americas |
102 MW | |
| Brotman II Power Station Gas · Brotman II, LLC |
102 MW | |
| Remy Jade II Unit 7 Unit 8 Power Station Gas · Remy Jade II, LLC |
102 MW | |
| Beachwood II Power Station Gas · Mark One II LLC |
102 MW | |
| PES 2 Power Station Gas · HO CLARKE GENERATING LLC |
102 MW | |
| RABBS U7 U8 Power Station Gas |
102 MW | |
| Brotman U1 U2 Power Station Gas |
102 MW | |
| Rowland Solar I Solar · Cutlass Solar LLC |
102 MW | |
| Grizzly Ridge Solar Solar + storage · Grizzly Ridge Solar LLC |
102 MW | |
| Chisholm Grid Other · Chisholm Grid, LLC |
102 MW | |
| Estonian Storage Other |
102 MW | |
| River Bend Other · Brazos Bend BESS LLC |
102 MW | |
| LMESASLR (BNB Lamesa Solar 1) Solar · BNB Lamesa Solar LLC |
102 MW | |
| Madero Unit2 Other · Ignacio Grid, LLC |
102 MW | |
| Madero Grid Other · Madero Grid, LLC |
102 MW | |
| Sun Valley BESS Other · Sun Valley Solar LLC |
101 MW | |
| Karankawa 2 Wind Onshore wind · Avangrid |
101 MW | |
| Swoose II Other · Swoose II, LLC |
101 MW | |
| Flower Valley II Batt Other · Flower Valley II, LLC |
101 MW | |
| Lucky Bluff BESS SLF Battery storage · Lucky Bluff BESS LLC |
101 MW | |
| North Fork Energy Storage Other · North Fork Energy Storage |
101 MW | |
| Bat Cave Energy Storage Other · Bat Cave Energy Storage |
101 MW | |
| Buckthorn Wind Onshore wind · NRG |
101 MW | |
| Eliza Storage Other · Ables Springs Storage, LLC |
100 MW | |
| St. Gall II Energy Storage Battery storage · St. Gall Energy Storage LLC |
100 MW | |
| Lapetus Solar Solar · Lapetus Energy Project, LLC |
100 MW | |
| Lignin (SJRR) Gas · SJRR Power LLC |
100 MW | |
| Old Bloomington Road Gas · Castleman Power |
100 MW | |
| Pearsall Expansion Gas · STEC |
100 MW | |
| Aquilla Lake 2 Wind Onshore wind · NextEra Energy |
100 MW | |
| Chamon Gas · Castleman Power |
100 MW | |
| CityVict Gas · Castleman Power |
100 MW | |
| Nacogdoches Project Other · Nacogdoches Power, LLC |
100 MW | |
| CALHOUN (Port Comfort) Gas · Castleman Power |
100 MW | |
| West of Pecos Solar Solar · Eon |
100 MW | |
| Anacacho Windfarm Onshore wind · Eon Climate & Renewables |
100 MW | |
| Pearsall Expansion Gas · STEC |
100 MW | |
| VictPort Gas · Castleman Power |
100 MW | |
| Blue Summit II Wind + storage · Nextera |
99.4 MW | |
| Coral Storage Other · Copperhead Solar, LLC |
99.0 MW | |
| Anchor Wind Onshore wind · Ranchland Wind Project,LLC |
98.9 MW | |
| Tavener 2 Solar |
98.0 MW |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- Southeast (non-ISO utilities)529 · 112.4 GW
- PJM (Mid-Atlantic, Midwest)1,192 · 97.6 GW
- ERCOT (Texas)613 · 95.3 GW
- MISO (Midcontinent)514 · 69.7 GW
- West (non-ISO utilities)963 · 64.7 GW
- SPP (Southwest Power Pool)299 · 45.1 GW
- CAISO (California)234 · 37.6 GW
- NYISO (New York)215 · 24.8 GW
- ISO-NE (New England)228 · 16.5 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)