ONSHORE WIND Β· ERCOTKeechi Wind 138 kV Joplin
Keechi Wind 138 kV Joplin is a 102 MW onshore wind request built and operating in the ERCOT interconnection queue.
Request details
- Queue ID
- 14INR0049_2
- Grid region
- ERCOT (Texas)
- Developer
- RES Americas
- Connection point (POI)
- Joplin (562)
- Technology
- Wind: 102 MW
- Total requested
- 102 MW
- Study phase
- IA
- Queue status
- Operational
- Entered queue
- 4 March 2013
- Agreement signed
- 8 November 2013
- Proposed online date
- January 2015
- Came online
- January 2015
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem