United States › Grid › Interconnection queues › Florida
OCTARY USA · INTERCONNECTION QUEUESQueue requests in study in Florida — page 5
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar project 312, Alachua County Solar · Florida Renewable Partners, LLC |
74.5 MW | Paused / redesign |
| Solar project 537, Hendry County Solar · FPL |
74.5 MW | In study |
| Solar project 101, Hillsborough County Solar |
74.5 MW | In study |
| Solar project 510, Manatee County Solar · FPL |
74.5 MW | In study |
| Solar project 428, Manatee County Solar · FPL |
74.5 MW | In study |
| Solar project 311, Alachua County Solar · Florida Renewable Partners, LLC |
74.5 MW | Paused / redesign |
| Solar project 427, Indian River County Solar · FPL |
74.5 MW | In study |
| Harmony 2 Solar |
74.5 MW | In study |
| Solar project 122, Hillsborough County Solar |
74.5 MW | In study |
| Solar project 404, St. Lucie County Solar · FPL |
74.5 MW | In study |
| Solar project 568, Collier County Solar · FPL |
74.5 MW | In study |
| Solar project 565, Collier County Solar · FPL |
74.5 MW | In study |
| Solar project 474, Desoto County Solar · FPL |
74.5 MW | In study |
| Solar project 284, Alachua County Solar · Florida Renewable Partners, LLC |
74.5 MW | In study |
| Solar project 193, Levy County Solar · Origis Development LLC |
70.0 MW | In study |
| Solar project 336, Gilchrist County Solar · Seminole Electric Cooperative, Inc |
61.2 MW | Paused / redesign |
| Gas project 419, Martin County Gas · FPL |
60.0 MW | In study |
| Taylor Creek Two Solar |
60.0 MW | In study |
| Solar project 111, Polk County Solar |
52.0 MW | In study |
| Solar project JEA-Q005-PV, Duval County Solar |
50.0 MW | Paused / redesign |
| Solar project JEA-Q006-PV, Duval County Solar |
50.0 MW | Paused / redesign |
| Solar project JEA-Q004-PV, Duval County Solar |
50.0 MW | Paused / redesign |
| Solar project JEA-Q003-PV, Duval County Solar |
50.0 MW | Paused / redesign |
| Battery storage project 120, Polk County Battery storage |
20.0 MW | In study |
| Solar project 123, Polk County Solar |
19.5 MW | In study |
| Other project FC100000, Pasco County Other · Masked |
13.1 MW | In study |
| Gas project FC100379, Orange County Gas · Masked |
12.0 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)