🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › Florida

OCTARY USA · INTERCONNECTION QUEUES

Queue requests in study in Florida — page 5

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown22721.4 GW
Active in queue24.3 GW251 requests
Agreement signed860 MW7 requests
Withdrawn47276.1 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

227 requests · page 5 of 5
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project 312, Alachua County
Solar · Florida Renewable Partners, LLC
74.5 MWPaused / redesign Alachua, FLSoutheast Apr 2022target 2026
Solar project 537, Hendry County
Solar · FPL
74.5 MWIn study Hendry, FLSoutheast Jan 2023target 2031
Solar project 101, Hillsborough County
Solar
74.5 MWIn study Hillsborough, FLSoutheast Apr 2023target 2025
Solar project 510, Manatee County
Solar · FPL
74.5 MWIn study Manatee, FLSoutheast Jan 2023target 2030
Solar project 428, Manatee County
Solar · FPL
74.5 MWIn study Manatee, FLSoutheast Mar 2022target 2026
Solar project 311, Alachua County
Solar · Florida Renewable Partners, LLC
74.5 MWPaused / redesign Alachua, FLSoutheast May 2022target 2025
Solar project 427, Indian River County
Solar · FPL
74.5 MWIn study Indian River, FLSoutheast Mar 2022target 2027
Harmony 2
Solar
74.5 MWIn study Osceola, FLSoutheast Dec 2020target 2024
Solar project 122, Hillsborough County
Solar
74.5 MWIn study Hillsborough, FLSoutheast May 2025target 2027
Solar project 404, St. Lucie County
Solar · FPL
74.5 MWIn study St. Lucie, FLSoutheast Jul 2020target 2026
Solar project 568, Collier County
Solar · FPL
74.5 MWIn study Collier, FLSoutheast Jul 2023target 2031
Solar project 565, Collier County
Solar · FPL
74.5 MWIn study Collier, FLSoutheast Jul 2023target 2032
Solar project 474, Desoto County
Solar · FPL
74.5 MWIn study Desoto, FLSoutheast Jul 2022target 2032
Solar project 284, Alachua County
Solar · Florida Renewable Partners, LLC
74.5 MWIn study Alachua, FLSoutheast Apr 2020target 2022
Solar project 193, Levy County
Solar · Origis Development LLC
70.0 MWIn study Levy, FLSoutheast Aug 2017target 2021
Solar project 336, Gilchrist County
Solar · Seminole Electric Cooperative, Inc
61.2 MWPaused / redesign Gilchrist, FLSoutheast Sep 2023target 2028
Gas project 419, Martin County
Gas · FPL
60.0 MWIn study Martin, FLSoutheast Sep 2020target 2026
Taylor Creek Two
Solar
60.0 MWIn study Orange, FLSoutheast Feb 2024target 2026
Solar project 111, Polk County
Solar
52.0 MWIn study Polk, FLSoutheast Mar 2024target 2027
Solar project JEA-Q005-PV, Duval County
Solar
50.0 MWPaused / redesign Duval, FLSoutheast Dec 2017target 2035
Solar project JEA-Q006-PV, Duval County
Solar
50.0 MWPaused / redesign Duval, FLSoutheast Dec 2017target 2050
Solar project JEA-Q004-PV, Duval County
Solar
50.0 MWPaused / redesign Duval, FLSoutheast Dec 2017target 2050
Solar project JEA-Q003-PV, Duval County
Solar
50.0 MWPaused / redesign Duval, FLSoutheast Dec 2017target 2050
Battery storage project 120, Polk County
Battery storage
20.0 MWIn study Polk, FLSoutheast May 2025target 2027
Solar project 123, Polk County
Solar
19.5 MWIn study Polk, FLSoutheast May 2025target 2027
Other project FC100000, Pasco County
Other · Masked
13.1 MWIn study Pasco, FLSoutheast Dec 2024target 2026
Gas project FC100379, Orange County
Gas · Masked
12.0 MWIn study Orange, FLSoutheast Nov 2025target 2026
Page 5 of 5

Capacity in the queue by state

Click a state to drill down.

By grid region

ISO/RTO markets and the non-ISO West and Southeast.

Requests by year joined

Capacity of requests in this view, by the year they entered the queue. Click a year.

20162025

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)